Al Ghail Infrastructure Phase 1 – Package 2 and 3

  • Client

    Ras Al Khaimah Economic Zone (RAKEZ)

  • Consultant

    CORE Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    63,771,340.45 AED

  • Duration

    Days

  • Location

    Ras Al Khaimah

View Project

Al Hamra Infrastructure Development Phase 2, 3, 4 & 5 Zone Project

  • Client

    Ras Al Khaimah Economic Zone (RAKEZ)

  • Consultant

    Capital Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    116,876,503.93 AED

  • Duration

    365 Days

  • Location

    Ras Al Khaimah

View Project

Al Hamra Industrial Zone Project (Zone 2 – Phase1A & 1B)

  • Client

    RAKEZ

  • Consultant

    Capital Engineering

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    101,806,564.16 AED

  • Duration

    540 Days

  • Location

    Ras Al Khaimah

View Project

Construction of yabsa bypass road

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    195,418,851.50 AED

  • Duration

    720 Days

  • Location

    Fujairah

View Project

Construction of Extension of Emirates Road From Al Aqran, UAQ to Al Taween, RAK

  • Client

    Ministry of Energy and Infrastructure

  • From

    From Al Aqran UAQ to Taween R.A.K

  • Consultant

    The Core Alliance Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    140,000,000.00 AED

  • Duration

    630 Days

  • Location

    Ras Al Khaimah

View Project

6-2021 Construction Maintenance Development and Upgrading of Jabal Mibrih Road

  • Client

    Ministry of Energy and Infrastructure

  • Consultant

    Dorsch Consultant

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    114,363,590.46 AED

  • Duration

    540 Days

  • Location

    Ras Al-Khaimah

View Project

Construction of Emirates Flight Academy – EKFA

Construction of Emirates Flight Academy (EKFA) & Hospitality Plots Infrastructure Works at the Aviation District of Dubai South

  • Client

    Dubai South

  • Consultant

    DAR Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    83,148,826.00 AED

  • Duration

    304 Days

  • Location

    Dubai

View Project

Upgrading of Etihad Road Stage 1 – Sh.Zayed Mosque Intersection – Ajman

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    195,418,851.50 AED

  • Duration

    720 Days

  • Location

    Fujairah

View Project

Construction of Internal Link Roads for Residential Complexes in Northern Zone Group 2

  • Client

    Ministry of Infrastructure Development

  • Consultant

    M/S Core Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    43,773,150.00.00 AED

  • Duration

    720 Days

  • Location

    Ras Al-Khaimah

View Project

Construction of Roads and Streetlight Network at Al Ghail Industrial Zone

  • Client

    Government of RAK - Economic Zone

  • Consultant

    Dorsch Consultant

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    39,423,884.10 AED

  • Duration

    300 Days

  • Location

    Ras Al-Khaimah

View Project

Multiple locations of EMARAT Filling Stations in the UAE

  • Client

    EMARAT

  • Consultant

    EMARAT

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    8,135,172.10

  • Location

    Across the UAE

View Project

Maintenance of Sheikh Mohammed Bin Zayed Road

  • Client

    Ministry of Infrastructure Development

  • Consultant

    The CORE Alliance Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    33,000,000.00 AED

  • Duration

    210 Days

  • Location

    Ras Al-Khaimah

View Project

Construction of Roads in Al Maqtaa Area

  • Client

    Umm Al Quwain Municipality

  • Consultant

    Umm Al Quwain Municipality

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,520,000.00 AED

  • Duration

    150 Days

  • Location

    Umm Al-Quwain

View Project

Improvement of Access Roads to GEMS and Dubai Heights Academy Schools at Al Barsha Second, Dubai

Access to Dubai Heights Academy and GEMS Schools – Construction of Access Roads and Improvement of Existing Roads.

  • Client

    Road and Traffic Engineering

  • Consultant

    RTC Consultants

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    28,968,508.60 AED

  • Duration

    180 Days

  • Location

    Dubai

View Project

Kalba Ring Road Phase 1

This gallery is of Kalba Ring Road, it consists of multiple phases and this is Phase 1 of the project.

  • Client

    Kalba Projects

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    28,000,000.00

  • Duration

    365 Days

  • Location

    Sharjah

View Project

Different project location in Fujairah

Multiple Location

  • Client

    Department of Public Works and Agriculture – Fujairah

  • Consultant

    Department of Public Works and Agriculture – Fujairah

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    22,413,847.05 AED

  • Duration

    180 Days

  • Location

    Fujairah

View Project

Addendum 1 forUpgrading of Etihad Road Stage 1- (Sh.Zayed Mosque Intersection – Ajman)

Water Drainage Channerl in ( Qadfaa, Marbah, Qaria), 2. Culvert in Qadfaa ( Al Jaradia), 3. Culvert & Drainage System in Alloloeya Khorfakkan, 4. Drainage System...

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Parsons

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    20,600,000.00 AED

  • Duration

    90 Days

  • Location

    Ajman

View Project

43-2021 Implementation of road and infrastructure works for the Bateen Al Samar Developmental Project in Ras Al Khaimah

Phase Two and Extension Area

  • Client

    Ministry of Energy and Infrastructure

  • Consultant

    Ministry of Energy and Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    20,450,000.00 AED

  • Duration

    180 Days

  • Location

    Ras Al-Khaimah

View Project

Maintenance Improvement and Upgrade of Hamad Bin Abdullah Road – Fujairah – Asphalt Works

  • Client

    BATCO

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    16,707,640.00 AED

  • Duration

    720 Days

  • Location

    Fujairah

View Project

Construction and Completion of Internal Roads in the Haboub Area 1 – Umm Al Quwain

  • Client

    Government of Umm Al Quwain Department of Urban and Planning

  • Consultant

    Government of Umm Al Quwain Department of Urban and Planning

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    7,956,461.30

  • Duration

    180 Days

  • Location

    Umm Al Quwain

View Project

Development and Upgrading of Itihad Taween Road Stage 2 – Filling with Imported Material Works

  • Client

    BATCO SAL/NBHH JV

  • Consultant

    Dorsch Holding GmbH – DC Abu Dhabi

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    15,000,000.00 AED

  • Duration

    270 Days

  • Location

    Ras Al-Khaimah

View Project

Construction of FOIZ Road

  • Client

    Al Sahraa Transport Group

  • Consultant

    U.A.E Armed Forces

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    15,000,000.00 AED

  • Duration

    180 Days

  • Location

    Fujairah

View Project

84-2020 Treatment Protection and Rock Stabilization for Yabsa Bypass Rd. Al Fujairah – Stage 2

  • Client

    Ministry of Energy and Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    14,899,037.00 AED

  • Location

    Fujairah

View Project

Construction of Al Jurf 2 Filling Station on Plot 1500 to 1503 Ajman

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    13,684,179.40 AED

  • Duration

    180 Days

  • Location

    Ajman

View Project

Construction and maintenance of roads in the Umm Al-Thaoub industrial area

For a length of 10 km

  • Client

    Umm Al Quwain Municipality

  • Consultant

    Umm Al Quwain Municipality

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    12,922,236.08 AED

  • Location

    Umm Al-Quwain

View Project

7 EMARAT Filling Station in Northern Emirates

  • Client

    EMARAT

  • Consultant

    EMARAT

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    12,680,642.00 AED

  • Duration

    90 Days

  • Location

    Sharjah

View Project

3-2021 Um AL Thoub Industrial Area 10.2Km

  • Client

    Government of Umm Al Quwain

  • Consultant

    Government of Umm Al Quwain

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    12,150,731.00 AED

  • Duration

    210 Days

  • Location

    Umm Al-Quwain

View Project

Removal, Re-routing and Construction of Road Works, Wet and Dry Infrastructure Services for the Central Kitchen at Aviation District of Dubai South

  • Client

    Dubai South

  • Consultant

    Dar Al Handasah Consultants

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    11,702,887.00 AED

  • Duration

    77 Days

  • Location

    Dubai

View Project

Saqr Port Road Refurbishment (Package 1)

  • Client

    RAK Port

  • Consultant

    Jacobs

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    10,332,180.00 AED

  • Duration

    180 Days

  • Location

    Ras Al-Khaimah

View Project

4-2021 Al Surra near UAQ University

  • Client

    Government of Umm Al Quwain

  • Consultant

    Government of Umm Al Quwain

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    9,339,414.00 AED

  • Duration

    210 Days

  • Location

    Umm Al-Quwain

View Project

Rehabilitation and Upgrading of Al Ghali Roads to Asphalt

  • Client

    RAK Investment Authority (RAKIA)

  • Consultant

    Home of Architectural for Engineering Consultant

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    8,500,000.00 AED

  • Duration

    630 Days

  • Location

    Ras Al-Khaimah

View Project

Construction of Roads at Al Qareen 1

  • Client

    Umm Al Quwain Municipality

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    7,861,709.00 AED

  • Location

    Umm Al-Quwain

View Project

New Dual Road and Roundabout near Steven Rock in Al Gjail Area

  • Client

    Government of Ras Al Khaimah Public Services Department

  • Consultant

    Government of Ras Al Khaimah Public Services Department

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    7,355,465.80 AED

  • Duration

    141 Days

  • Location

    Ras Al-Khaimah

View Project

Construction and maintenance of deportion prison project

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Ministry of Infrastructure Development

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    6,811,000.00 AED

  • Duration

    91 Days

  • Location

    Dubai

View Project

Construction of Roads in Rigga Area

  • Client

    Umm Al Quwain Municipality

  • Consultant

    Umm Al Quwain Municipality

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    6,250,000.00 AED

  • Duration

    120 Days

  • Location

    Umm Al-Quwain

View Project

Construction of Access Road to Proposed Al Aalia Filing Station

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    6,175,395.86 AED

  • Duration

    120 days

  • Location

    Ajman

View Project

Supply and Laying of Asphalt Works – Umm Al Quwain

  • Client

    Pioneer Road Construction & Infrastructure L.L.C.

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    5,500,000.00 AED

  • Duration

    720 Days

  • Location

    Umm Al Quwain

View Project

Access Road to Proposed Khawaled Filling Station on Plot No. 230 and Thuqueibah filling station on Plot No.232, Sharjah, UAE

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    5,479,199.72 AED

  • Duration

    120 Days

  • Location

    Sharjah

View Project

2023/1 Full Construction of Asphalt Internal Roads in Al-Rashidiya Area – Umm Al Quwain.

  • Client

    Government of Umm Al Quwain Department of Urban and Planning

  • Consultant

    Government of Umm Al Quwain Department of Urban and Planning

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    5,470,643.70 AED

  • Duration

    180 Days

  • Location

    Umm Al Quwain

View Project

RAK Maritime City Reclamation Access Road-Package 2

  • Client

    RAK Port

  • Consultant

    Jacobs

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    5,443,460.40 AED

  • Duration

    150 Days

  • Location

    Ras Al-Khaimah

View Project

Asphalt Works for Residential Complexes Group 3

  • Client

    Trans Horizon International Roads Contracting L.LC.

  • Consultant

    Core Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    195,418,851.50 AED

  • Duration

    90 Days

  • Location

    Ras Al Khaimah

View Project

Access Road for Proposed Meliha Khudeirah Filling Station on Plot No. 887, Sharjah

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,405,754.16 AED

  • Duration

    120 Days

  • Location

    Sharjah

View Project

2023/2 Full Construction of Asphalt Internal Roads in Al-Nabghah Area – Falaj Al Muallah, Umm Al Quwain

  • Client

    Government of Umm Al Quwain Department of Urban and Planning

  • Consultant

    Government of Umm Al Quwain Department of Urban and Planning

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,395,404.65 AED

  • Duration

    180 Days

  • Location

    Umm Al Quwain

View Project

Construction of Access Roads to Proposed Sajaa Filling Station in Sharjah and Al Jazeera Fillin

  • Client

    Emirates General Petroleum (EMARAT)

  • Consultant

    Al Gurg Consultant

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    8,235,566.96 AED

  • Duration

    120 Days

  • Location

    Sharjah

View Project

Access Road for Proposed Hafira Filling Station on Plot No. 951, Sharjah

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    3,831,129.75 AED

  • Duration

    120 Days

  • Location

    Sharjah

View Project

Construction and completion of 4 roads in Umm Al Thoub area Industrial Zone

  • Client

    Government of Umm Al Quwain

  • Consultant

    Government of Umm Al Quwain

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    3,665,547.00 AED

  • Duration

    70 Days

  • Location

    Umm Al-Quwain

View Project

Different project location in Fujairah

  • Client

    Department of Public Works and Agriculture – Fujairah

  • Consultant

    Department of Public Works and Agriculture – Fujairah

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    149,704,213.71 AED

  • Duration

    180 Days

  • Location

    Fujairah

View Project

4 EMARAT Filling Station in Northern Emirates

  • Client

    EMARAT

  • Consultant

    EMARAT

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,528,481.00 AED

  • Duration

    120 Days

  • Location

    Ras Al-Khaimah

View Project

PT 162/1 Road and Infrastructure Works at Dubai Industrial City

  • Client

    Al Habtoor Leighton Group

  • Consultant

    AECOM

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,700,000.00 AED

  • Duration

    120 Days

  • Location

    Dubai

View Project

Access Road for Proposed Filling Station On Plot No. 705014027 American University (Al Ashish), Ras Al Khaimah

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    3,020,495.86 AED

  • Duration

    120 Days

  • Location

    Ras Al Khaimah

View Project

Saqr Port New Entrances (Gate 3 &4), RAK

  • Client

    RAK Port

  • Consultant

    JACOBS

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,345,645.00 AED

  • Duration

    180 Days

  • Location

    RAK

View Project

Access Road for Proposed Khorfakkan Filling Station On Plot No. 424 At Sharjah

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,823,734.70 AED

  • Duration

    120 Days

  • Location

    Sharjah

View Project

Access Road for Proposed Blidoua Filling Station on Plot No. 0008 in Umm Al Quwain

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,762,493.29 AED

  • Duration

    120 Days

  • Location

    Umm Al Quwain

View Project

Construction of Access Road to Manama Filling Station

  • Client

    EMARAT

  • Consultant

    EMARAT

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,636,613.00 AED

  • Duration

    120 Days

  • Location

    Dubai

View Project

Construction of Umm Al Quwain Warehouse City

Plot No. 2 Block 1, Sector 13 Umm Al Thoub Area 7.

  • Client

    Asia Prime General Contracting LLC

  • Consultant

    Concept Consulting Engineer

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,542,570.20 AED

  • Duration

    52 Days

  • Location

    Umm Al-Quwain

View Project

ENOC 1301 Service Station Road Works

  • Client

    Green Oasis General Contracting Co. LLC

  • Consultant

    Al Gurg Consultant

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,922,878.00 AED

  • Duration

    60 Days

  • Location

    Umm Al-Quwain

View Project

Construction Completion and Maintenance of Infrastructure Works and Chiller Plant Room

(MEP Works) at Souk Warsan Zone 1 and 2 Al Warsan – Asphalt Works

  • Client

    Flora Boring Excavation Contracting LLC

  • Consultant

    A7

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,864,130.00 AED

  • Duration

    25 Days

  • Location

    Dubai

View Project

Access Road to Proposed Hinya Filling Station on Plot No.1, Hinya, Fujairah

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,796,286.68 AED

  • Location

    Fujairah

  • Duration

    120 days

View Project

Access Road for Proposed Seih Al Sadha Fillings Station on Plot No. 9661, Sharjah

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,785,024.60 AED

  • Duration

    120 Days

  • Location

    Sharjah

View Project

Construction of Access Road to Proposed Al Jurf Industrial 1 Filing Station on Plot No. 984, Ajman, UAE

  • Client

    EMARAT

  • Consultant

    CDSM Smith Inc.

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,613,101.89 AED

  • Location

    Ajman

View Project

Construction of Al Houshi Filling Station in Sharjah U.A.E

  • Client

    GINCO

  • Consultant

    Al Gurg Consultant

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,456,000.00 AED

  • Duration

    90 Days

  • Location

    Sharjah

View Project

Construction and Completion of roads and parking lots in Al Rawdah Area, Umm Al Quwain

  • Client

    Government of Umm Al Quwain Department of Urban and Planning

  • Consultant

    Government of Umm Al Quwain Department of Urban and Planning

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,084,636.31 AED

  • Duration

    50 Days

  • Location

    Umm Al Quwain

View Project

Waste Water Treatment Plant

  • Client

    Eagle Electromechanical Co. LLC

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    759,375.00 AED

  • Location

    Dubai

View Project

Construction of Al Jurf 2 Filling Station Plot No.1500 to 1503 in Ajman

  • Client

    EMARAT

  • Consultant

    EMARAT

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    13,684,179.40 AED

  • Duration

    90 Days

  • Location

    Ajman

View Project

Biyatah Road

Biyatah Road R/20/2009

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Ministry of Infrastructure Development

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,400,000.00 AED

  • Duration

    91 Days

  • Location

    Dubai

View Project

Construction of Internal Roads in Umm Al Quwain

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Ministry of Infrastructure Development

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,800,000.00 AED

  • Duration

    182 Days

  • Location

    Dubai

View Project

Construction of Internal Roads in Qirat & Awhala

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Ministry of Infrastructure Development

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,400,000.00 AED

  • Duration

    213 Days

  • Location

    Fujairah

View Project

Construction of Internal Roads in Falaj Al Mualla & Rafaq

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Ministry of Infrastructure Development

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    5,000,000.00 AED

  • Duration

    213 Days

  • Location

    Dubai

View Project

Umm Al Quwain General Hospital

  • Client

    MCM Group Abu Dhabi LLC

  • Consultant

    HDP Overseas LTD

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,200,000.00 AED

  • Duration

    365 Days

  • Location

    Umm Al-Quwain

View Project

Dubai Airport Road Improvement – Phase 1&2 Beirut Road Al Nadha Road Junction

  • Client

    Yuksel Dubai Cons. LLC

  • Consultant

    Parsons De Lew Cather Overseas Limited

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    11,000,000.00 AED

  • Duration

    395 Days

  • Location

    Dubai

View Project

Construction of internal roads in Al Tayba

  • Client

    Department of Public Works and Agriculture – Fujairah

  • Consultant

    Department of Public Works and Agriculture – Fujairah

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,846,860.00.00 AED

  • Duration

    91 Days

  • Location

    Fujairah

View Project

Construction of internal roads in Al Jareif

  • Client

    Department of Public Works and Agriculture – Fujairah

  • Consultant

    Department of Public Works and Agriculture – Fujairah

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,897,134.00.00 AED

  • Duration

    91 Days

  • Location

    Dubai

View Project

Removal Re-routing and Construction of Road Works

Wet and Dry Infrastructure Services for the Central Kitchen at Aviation District of Dubai South.

  • Client

    Dubai South

  • Consultant

    DAR Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    11,702,887.00 AED

  • Duration

    180 Days

View Project

Dualization of undualized section of DIBBA-masafi road – stage 2 – section 2

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Consultant HSS

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    29,105,365.00.00 AED

  • Duration

    300 Days

  • Location

    Dubai

View Project

Asphalting the training village

  • Client

    Ministry of Interior

  • Consultant

    Secure Express

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    4,502,030.00.00 AED

  • Duration

    90 Days

  • Location

    Dubai

View Project

Construction of internal roads in Al Tawain

  • Client

    Department of Public Works and Agriculture – Fujairah

  • Consultant

    Department of Public Works and Agriculture – Fujairah

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    2,277,735.00.00 AED

  • Duration

    91 Days

  • Location

    Fujairah

View Project

Widening of Dubai Pass Road

Widening of Dubai Pass Road Phase 1 & 2 – R762/1

  • Client

    Yuksel Dubai Cons. LLC

  • Consultant

    Wilbur Smith Associates

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    55,000,000.00 AED

  • Duration

    720 Days

  • Location

    Dubai

View Project

Construction and maintenance of dams in Sekamkam Basin

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Consultant HSS

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    41,000,000.00 AED

  • Duration

    365 Days

  • Location

    Fujairah

View Project

Khor Fakkan Truck Ring Road

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    35,528,350.00 AED

  • Duration

    390 Days

  • Location

    Sharjah

View Project

Al Oweis Dam

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Ministry of Infrastructure Development

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    16,056,000.00 AED

  • Duration

    330 Days

  • Location

    Fujairah

View Project

Construction of Dams in Sakamkam

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    10,000,000.00.00 AED

  • Duration

    150 Days

  • Location

    Dubai

View Project

Sheikh Khalifa specialist hospital project in Ras Al Khaimah

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Al Bayaty Architects

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    15,985.000.00 AED

  • Duration

    165 Days

  • Location

    Dubai

View Project

Link road between Sheikh Khalifa street

(Fujairah) with Khatam Al Mualaha border post and road e99 (phase 1)

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    28,240,985.50.00 AED

  • Duration

    365 Days

  • Location

    Dubai

View Project

DIBBA – MASAFI ROAD – STAGE 3 – TRUCK ROAD

  • Client

    Ministry of Infrastructure Development

  • Consultant

    Idroesse Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    79,976,578.50.00 AED

  • Duration

    464 Days

  • Location

    Dubai

View Project

Construction and Completion of Roads in the Al Abraq Area

  • Client

    Government of Umm Al Quwain Department of Urban and Planning

  • Consultant

    Government of Umm Al Quwain Department of Urban and Planning

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    11076271.78

  • Duration

    180 Days

  • Location

    Umm Al Quwain

View Project

Construction and Completion of Internal Roads in the Mohammed Bin Rashed 2 Area – Umm Al Quwain

  • Client

    Government of Umm Al Quwain Department of Urban and Planning

  • Consultant

    Government of Umm Al Quwain Department of Urban and Planning

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    8608130.97

  • Duration

    210

  • Location

    Umm Al Quwain

View Project

Construction and Completion Maintenance and Guarantee of Bridge & Road Connection from E11 to Saniya Island at Umm Al Quwain

  • Client

    BATCO

  • Consultant

    CORE Engineering Consultancy

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    6,866,077.40

  • Duration

  • Location

    Um Al Quwain

View Project

79-2024 Design & Implementation of a lane addition MBZ (E311)

  • Client

    Ministry of Energy and Infrastructure

  • Consultant

    Ministry of Energy and Infrastructure

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    34,924,319.71

  • Duration

    345 Days

  • Location

    Umm Al Quwain

View Project

C001-24003 Construction of Internal Asphalt Road in Qidfaa Fujairah for 2.2

  • Client

    UAE Armed Forces Command of Military Work

  • Consultant

    UAE Armed Forces Command of Military Work

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    6,000,000.00

  • Duration

    90 Dyas

  • Location

    Fujairah

View Project

Improvement of Abu Amr Al Basri Street

  • Client

    Government of Sharjah Road and Transport Authority

  • Consultant

    Government of Sharjah Road and Transport Authority

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    10,839,013.70 AED

  • Duration

    123 Days

  • Location

    Sharjah

View Project

Road Works for the additional Camel Race Track in Al Dhaid, Sharjah

  • Client

    Government of Sharjah Road and Transport Authority

  • Consultant

    Government of Sharjah Road and Transport Authority

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    16,927,873.92

  • Duration

    123 Days

  • Location

    Sharjah

View Project

Fabrication, Supply, And Installation of Count- Down And Directional Signs For Various Filling Stations In Dubai And Northern Emirates

  • Client

    EMARAT

  • Consultant

    EMARAT

  • Main Contractor

    Fala Road Contracting L.L.C

  • Contract Value

    1,094,888.00 AED

  • Duration

    120 Days

  • Location

    Dubai

View Project

Construction, Completion, Maintenance and Guarantee of Bridge & Road Connection from E11 to Siniya Island at UAQ

    View Project

    Development and Upgrading of Itihad Taween

    Road stage 2 (development and upgrading of Itihad Taween road stage 2 (filling with imported materials works)

    • Client

      BATCO SAL/NBHH JV

    • Consultant

      Dorsch Holding GmbH – DC Abu Dhabi

    • Main Contractor

      Fala Road Contracting L.L.C

    • Contract Value

      7,960,265.00.00 AED

    • Duration

      365 Days

    • Location

      Dubai

    View Project

    Access Road to Proposed Al Soor Kalba Filling Station on Plot No. 1584, Al Soor Kalba, Sharjah

    • Client

      EMARAT

    • Consultant

      CDSM Smith Inc.

    • Main Contractor

      Fala Road Contracting L.L.C

    • Contract Value

      1,752,209.10 AED

    • Duration

      120 Days

    • Location

      Sharjah

    View Project

    Sweden Driving School

    • Client

      Sweden Safety Institute

    • Consultant

      Adwar Engineering Consultants

    • Main Contractor

      Fala Road Contracting L.L.C

    • Contract Value

      1,400,000.00 AED

    • Duration

      122 Days

    • Location

      Umm Al-Quwain

    View Project

    Dubai Police Head Quarter Foundation Excavation

    • Client

      Tower Foundation

    • Consultant

      Kings Consultant

    • Main Contractor

      Fala Road Contracting L.L.C

    • Contract Value

      274,000.00 AED

    • Duration

      61 Days

    • Location

      Dubai